Turnkey EPC • 100 kW to Multi-Megawatt Scale

Industrial Solar Plants in UP
Power Your Factory at Zero Grid Penalty

Drastically curtail high peak-hour industrial tariffs (HT 11kV/33kV), avoid maximum demand penalties, and secure reliable clean captive electricity for heavy manufacturing operations.

HT 11kV / 33kV Grid Tie CAPEX & OPEX (RESCO) SCADA & IoT Telemetry

Full regulatory clearance support with UPNEDA, CEIG (Electrical Safety), & DISCOMs

Industrial Solar Plant Uttar Pradesh
HIGH TENSION (HT) SOLAR
Electricity Bill Reduction
60% - 75%
Typical Factory Savings
₹3L - ₹15L/mo
Power Factor (PF)
Maintained >0.98
Payback Horizon
2.4 - 3.2 Yrs
Demand Charge Cuts
Contract kVA Peak Shaving

Solar generates at peak factory operating hours, curbing contract demand overshoots and costly grid penalties.

HT Interconnect
11kV & 33kV Dedicated Bays

Engineered with step-up oil-cooled transformers, Vacuum Circuit Breakers (VCB), and CEIG certified electrical switchyards.

40% Tax Relief
Sec 32 Depreciation

Write off 40% asset value in Year 1 against industrial profits + claim 100% 18% GST Input Credit.

Central SCADA
String-Level Analytics

Real-time string telemetry, pyranometer weather logging, thermal anomaly detection, and automated alarms.

Industrial Output Matrix

Industrial Solar Plant Capacity & ROI Calculator

Select your factory or plant capacity to view monthly generation, tariff savings, required shed/roof area, and payback.

Monthly Units
12,500 Units
400-450 units/day
Monthly Savings
₹1,15,000
At ₹9.20/unit HT tariff
40% Tax Write-Off
₹18.0 Lakhs
Direct Profit Shield
18% GST ITC
₹8.1 Lakhs
Tax Credit Claim
Shed/Land Area
10,000 Sq.Ft
Tin Shed / RCC Roof
Capital Payback
2.9 Years
Full ROI Horizon
Looking for zero upfront CAPEX options?

We offer RESCO / OPEX models where we invest, install, and maintain the plant while you buy solar power at a pre-agreed low PPA tariff.

Enquire for RESCO / PPA
Engineered for Factory Harshness

Industrial Component Architecture

Designed to withstand chemical vapors, metallic dust, wind shears, and continuous 24x7 heavy factory cycles.

Dual-Glass N-Type Bifacial

580Wp+ TOPCon dual-glass modules resist PID, salt-mist, ammonia, and chemical corrosion with up to 25% rear-side albedo energy gain.

High-Capacity String Inverters

100kW - 350kW string inverters with up to 12 MPPTs, smart night SVG (Static Var Generator) for active Power Factor correction, and IP66 sealing.

Leak-Proof Non-Penetrative Clamps

Specialized standing seam & trapezoidal anodized aluminum clamps install on factory tin sheds without drilling any holes, preserving roof warranty.

Industrial Clearances & FAQs

Industrial Solar FAQs

What approvals are mandatory for an Industrial Solar Plant in UP?

For plants above 50kW or connecting at 11kV/33kV, mandatory clearances include DISCOM Technical Feasibility Approval (TFR), Chief Electrical Inspector to Government (CEIG) Safety Inspection & Energisation Sanction, and UPNEDA registration.

Can our industrial shed roof safely support solar panels?

Our structural engineering team carries out STAAD.Pro structural load analysis before installation. Standard solar arrays add only 12-15 kg/m², well within the structural safety margins of modern PEB (Pre-Engineered Building) factory sheds.

What is the difference between CAPEX and OPEX/RESCO models?

In CAPEX, the industry self-funds or takes a bank loan, owns the plant, and enjoys 100% of the energy savings, 40% depreciation, and 18% GST ITC. In OPEX/RESCO, a third-party investor funds the entire plant on your roof, and you simply buy power at a discounted PPA rate (₹4.50-₹5.50/unit).

How does solar help with industrial Power Factor penalties?

Modern industrial string inverters feature built-in reactive power management (Q at night / Static Var Generator mode). They automatically inject inductive or capacitive reactive power into the factory busbar, helping you maintain a power factor close to unity (1.00) and avoid DISCOM penalties.

Full EPC & O&M Execution

Slash Factory Operational Costs with MW-Scale Solar

Let our industrial project team visit your manufacturing unit. We will evaluate your HT connection capacity, factory load curves, shed integrity, and provide a complete bankable DPR.

Trusted & Certified By